location: Bad Häring, Tirol
construction: wood frame walls, prefab home
| after a lot of planning and formalities, finally the start |
| drainage layer |
![]() |
| placing of the concrete basement |
| our VW workers hut |
![]() |
| prefab walls assembly |
| 2° flat roof with EPDM cover |
![]() |
| isolation |
![]() |
| plastering |
| floor screed done |
| hydraulic installations, woodgas heater and solarthermal system preparation with 4000L storage tanks |
![]() | |||
| Rigips plastering madness |
| done :) |