speedEDIT: Kellerbau Zeitraffer / basement building time lapse - McGyver theme from solarthermienator on Vimeo.
Friday, June 21, 2013
Tuesday, May 14, 2013
planing & building a low-energy house
goal: building a low-energy house during one year, including preparation and planing
location: Bad Häring, Tirol
construction: wood frame walls, prefab home
location: Bad Häring, Tirol
construction: wood frame walls, prefab home
| after a lot of planning and formalities, finally the start |
| drainage layer |
![]() |
| placing of the concrete basement |
| our VW workers hut |
![]() |
| prefab walls assembly |
| 2° flat roof with EPDM cover |
![]() |
| isolation |
![]() |
| plastering |
| floor screed done |
| hydraulic installations, woodgas heater and solarthermal system preparation with 4000L storage tanks |
![]() | |||
| Rigips plastering madness |
| done :) |
Monday, March 4, 2013
Mounting airproof blind/shutter cranks - Luftdichte Raffstorekurbeln
Check out my fresh new manual. This has possibly never been done before this way. :)
Feel free to use it for your own house, the instructions are also suitable for retrofitting.
Feel free to use it for your own house, the instructions are also suitable for retrofitting.
Subscribe to:
Comments (Atom)





